Free on-site estimate
Every quote starts with a real measurement.
Every job runs on the same standard.
Every quote starts with a real measurement.
Itemized, no surprises.
All step types covered.
Lift-and-relevel or full rebuild.
Same crew start to finish.
Takes 30 seconds.
Free, no obligation.
Itemized, no surprises.
Full site cleanup on completion.
Uneven step height is a trip hazard and a common sign of a settled base underneath.
Steps carry concentrated foot traffic on a small footprint – the base has to be built for that.
We assess whether your existing steps can be releveled or need a full rebuild.
Interlock Experts Toronto treats steps as a higher-load application than a flat driveway or patio. All the weight of foot traffic passes through the same narrow footprint step after step, so an under-built base shows uneven settling faster here than almost anywhere else on a property.
Not every settled step needs a full teardown. If the pavers themselves are sound and only the base has shifted, a lift-and-relevel repair is often enough. If the settling is uneven or the base has failed in multiple spots, a rebuild is the more honest recommendation.
Sometimes – it depends on whether the base has settled evenly or unevenly, and whether the pavers themselves are still sound.
Small step repairs often run 1-2 days; a full rebuild with a retaining element can take longer.
Yes – concentrated foot traffic on a small footprint makes a shallow base fail faster, not slower.